📋 Project Identity
Project Setup
Name, location, population, deployment context
🏛
PNG, JPG or SVG · Max 2MB · 200×200px recommended
📏 Compliance Standard
Select Standard
Thresholds auto-load and drive all sensor compliance checks
WHO 2022
Standard Threshold Reference
WHO 2022 limits — driving all compliance checks below
🌊 Water Source Classification
Source Type
Characterise the raw water inlet
Select a source type to see characterisation notes.
Incoming Parameters
Enter raw water measurements
⚠️ Contamination Risk Classification
Parameters vs. selected standard limits
🧪 Heavy Metals Panel
Key contaminants of concern for water safety
🏗️ Treatment System Builder — click to add / click again to remove
Your Treatment Train
Modules in order of treatment flow
Click modules above to build your treatment train →
—
Footprint (m²)
—
Power (W)
—
Solar Panel (W)
—
People / day
—
Capital Cost (USD)
—
Opex (USD/mo)
—
Compliance Est.
—
Output (L/day)
📊 Treatment Efficiency — Predicted Removal
Cumulative removal rates from your selected train
Build a treatment train above to see predicted removal rates.
1
Total Nodes
1
Online
0
Warning
0
Offline
🗺️ Hotspot Map — Live Compliance Status
Node pins update automatically — Safe / Borderline / Unsafe
Add nodes below — compliance pins appear here
Safe
Borderline
Unsafe
⚠️ Active Compliance Alerts
Real-time parameter breaches vs. WHO 2022
All parameters within limits
No active alerts — readings within selected standard.
🚰 Intended Use of Treated Water
Selecting intended use auto-adjusts the compliance thresholds applied in the sensor monitoring panel.
🌿 Carbon Material Input
Engineered / functional carbon for treatment & sequestration
📊 Sustainability Metrics
—
CO₂e Seq. (kg/mo)
—
Solar Coverage
—
Cost / Litre (USD)
—
Lives Impacted
—
L per kg Carbon
—
Credits (tCO₂e/yr)
💰 Verdini Carbon Credits Pathway
Engineered and functional carbon materials used in water treatment may qualify under the Verdini Biochar / Carbon Tracker methodology. Estimated sequestration: 2.5 tCO₂e per tonne of carbon material (EBC Class A equivalent). Credits pending third-party verification via Verdini Native standard.
📦 Bill of Materials
Build a treatment train in Section 3 to auto-generate your Bill of Materials.
🔧 Installation Sequence
Build a treatment train in Section 3 to generate installation steps.
🗓️ Maintenance Schedule
Build a treatment train in Section 3 to generate your maintenance schedule.
🚨 Emergency Protocol
!
Parameter Exceeds Safe Limit
Stop distribution immediately. Isolate the affected stage. Collect a duplicate sample for confirmatory testing. Notify the project operator and relevant authority within 24 hours.
!
Sensor Node Offline
Default to manual sampling at 6-hour intervals. Check power supply, antenna, and physical connectivity. If offline >12 hours, trigger field inspection.
!
Contamination Event (Visual / Odour)
Increase disinfection dose. Issue boil-water notice if required. Sample upstream/downstream to locate source. Document in chain-of-custody log.
🧪 Log Certified Lab Result
📄 Lab Records
No lab records logged yet.
📤 Research Data Export
Full compliance report + structured data export
📋
Full Compliance Report + Data Export
$29
PDF report · Chain-of-custody · JSON + CSV sensor data · BOM · Lab records · Carbon metrics · Submission-ready
Export includes:
✅ Full compliance PDF report
✅ Chain-of-custody + signature block
✅ All sensor readings (JSON + CSV)
✅ Treatment train specification
✅ BOM and maintenance schedule
✅ Lab records with accreditation
✅ Carbon & sustainability metrics
✅ Submission-ready (EPA, Livsmedelsverket, WHO)
✅ Chain-of-custody + signature block
✅ All sensor readings (JSON + CSV)
✅ Treatment train specification
✅ BOM and maintenance schedule
✅ Lab records with accreditation
✅ Carbon & sustainability metrics
✅ Submission-ready (EPA, Livsmedelsverket, WHO)